Next week, the stained glass protection will be mounted, and the old organ will be taken out with the help of Peter Krasinski, our wonderful organist, who is so appreciative of the gift of this organ.
Just after New Years, the abatement contractors will set up the protection as they prepare to remove all hazardous materials from the space. These materials are mostly floor tile and some insulation that is basically inert but State Law requires it is handled by liscenced contractor. As this begins, there will be absolutely NO access to the sanctuary as the space will be hermetically sealed with a negative pressure ventilation system and contained with sheets of heavy plastic. The contractors will be using the side entrance to access the space and to properly remove and dispose of any hazardous material. As in any abatement job, we will follow very stringent procedures, in accordance with all federal, state, and local laws.
And air monitoring will be done by an inspector - throughout the project each day –the inspector will be independent of the abatement contractor. The process is expected to take about a week. During this process, and throughout the entire renovation, the rest of the building will be completely accessible and safe.
We will try to provide ongoing updates throughout the renovation, and we have a new blog where you can also see pictures, and find out what progress is being made.
If you have any questions, please feel free to contact either Mike Wolfson or Elyse Shuster.